庭院營造服務流程
1. Design Consultation 設計咨詢
Designers will conduct one-to-one in-depth consultations to understand your core needs and vision for the space.During the communication, if you need to visit active project sites, we will assign a special person to accompany and explain throughout, intuitively presenting construction standards and implementation effects to lay a solid foundation for subsequent design work.
設計師將通過電話或面對面形式,與您開展一對一充分溝通,準確對接核心訴求與場景期望。溝通期間,若您需實地考察在建項目,我們將指派專人全程陪同講解,直觀呈現施工標準與落地效果,為后續設計工作奠定堅實基礎。
2. Site Survey 場地勘測
If you confirm to choose our service, both parties shall sign the "Entrusted Design Agreement", and pay a design deposit (this fee can be offset against the design fee in equal amount when formally signing the design contract). We will conduct on-site courtyard surveys using professional measuring instruments at the agreed time to accurately collect core data such as site dimensions and topographical conditions.
若您確認選擇我方服務,雙方需簽訂《委托設計協議書》,并支付設計定金(該費用可在正式簽訂設計合同時等額抵充設計費)。我們將按約定時間,運用專用測量儀器開展庭院實地勘測,準確采集場地尺寸、地形條件等核心數據。
3. Scheme Design 方案設計
Within 7 working days after the completion of the on-site survey, designer will invite you to review the preliminary design scheme (including core documents such as original site dimension drawings and plane function layout drawings) and continuously optimize and adjust it according to your feedback until a consensus is reached.
After the preliminary scheme is confirmed, we will issue a preliminary budget based on the scheme and conduct synchronous communication. If the budget range is approved by you, both parties will sign a formal design contract, and we will initiate detailed drawing work. The designer will fully carry out drawing preparation and project cost budget compilation. If you need to take the drawings away from the company for discussion, the full design fee must be paid before collection.
實地勘測完成后 7個工作日內,設計師將邀約您審核初步設計方案(含原始場地尺寸圖、平面功能布置圖等核心文件),并根據您的反饋持續優化調整,直至達成共識。
初步方案確認后,我方將基于方案出具初步預算并同步溝通。若預算范圍獲得您的認可,雙方簽訂正式設計合同,將啟動圖紙深化工作。設計師將開展圖紙繪制與工程造價預算編制工作。若需將圖紙帶離公司商議,需全額支付設計費后方可獲得。
4. Construction Design 施工設計
The construction drawing system includes the following core documents:
1)Master plan; 2)Vertical design drawing (if necessary); 3)Civil engineering design drawing (including hard paving, etc.); 4)Detailed structural node drawings; 5)Water feature pipeline layout drawing; 6)Circuit system layout drawing. Supporting intention reference drawings are provided for each design link to ensure the accurate implementation of design concepts.
施工圖紙體系包含以下核心文件:
1. 總平面圖;2. 豎向設計圖(如有必要);3. 土建設計圖(含硬質鋪裝等);4. 構筑節點詳圖;5. 水景管線布置圖;6. 電路系統布置圖。各設計環節同步提供配套意向參考圖,確保設計理念準確落地。
5. On-site Construction 現場施工
Signing the Construction Contract: After confirming the construction drawings and project cost, both parties shall sign a formal construction contract. Before the start of construction, you need to pay the project progress payment as agreed in the contract.
Main Material Selection: To ensure the accurate implementation of the design effect, the designer will accompany you throughout the selection of key parameters such as material, color and specification of main materials, ensuring that the materials are highly consistent with the design scheme.
Designer's project handover and briefing: On the start date of construction, the designer will go to the construction site to conduct technical disclosure to the construction team, clarifying design requirements and process standards. During the construction period, the designer will conduct regular site inspections and maintain real-time communication with the construction team to ensure the consistency of design implementation.
Process and Phased Acceptance: civil engineering → water and electricity installation → tiling and masonry work → greening → painting → lighting installation → final acceptance. After the completion of each construction phase, our company will assign a special person to conduct node acceptance, and the next process can only be carried out after your signature confirmation of qualification.
簽訂施工合同:施工圖紙與工程造價確認后,雙方簽訂正式施工合同。開工前,您需支付合同約定的工程進度款。
主材選購:為保障設計效果準確落地,設計師將全程陪同您選定主材的材質、顏色、規格等關鍵參數,確保材料與設計方案高度契合。
設計師交底:開工當日,設計師將赴施工現場向施工團隊開展技術交底,明確設計要求與工藝標準。施工期間,設計師將定期巡檢工地,與施工團隊保持實時溝通,保障設計落地一致性。
工序及階段驗收:土建→水電→泥瓦→綠化→油漆→照明安裝→竣工驗收。每個施工階段完成后,公司將委派專人開展節點驗收,經您簽字確認合格后,方可進入下一工序。
6. Construction Acceptance 施工驗收
After the project is completed, we will conduct a comprehensive project acceptance together with you. After the acceptance is qualified and confirmed by your signature, we will issue a warranty card and supporting gifts simultaneously to protect your subsequent rights and interests.
項目竣工后,我方將與您共同開展工程總驗收。驗收合格并經您簽字確認后,我們將同步出具保修卡及配套贈品,保障您的后續權益。