1. Design-Construction Handover 設計施工交接
Designers and the construction team conduct special handover, clarifying the details of construction drawings, process standards and key node requirements, and transferring technical disclosure documents simultaneously to ensure the accurate implementation of design intentions.
設計師與施工團隊開展專項交接,明確施工圖紙細節、工藝標準及關鍵節點要求,同步移交技術交底文件,確保設計意圖準確落地。
2. Site Clearing 場地清理
Complete on-site cleaning of the construction area, carry out standardized demolition and removal of old facilities and obstacles that need to be dismantled, ensuring the construction site is tidy and free from safety hazards.
完成施工區域現場清理,對需拆砸的舊有設施、障礙物進行規范拆除與清運,保障施工場地整潔、無安全隱患。
3. Site Leveling 場地平整
According to the requirements of vertical design, we will carry out earthwork leveling and compaction treatment on the site to ensure that the site elevation meets the design standards and lays a foundation for subsequent construction.
根據豎向設計要求,對場地進行土方找平、壓實處理,確保場地的標高符合設計標準,為后續施工奠定基礎。
4. Full Courtyard Setting Out 全院放線
We will use professional measuring instruments to complete the full courtyard setting out according to the master plan layout drawing, clarifying the position boundaries of core areas such as structures, paving and pipelines to ensure construction accuracy.
使用專用測量儀器,按總平面放樣定位圖完成全院放線,明確構筑物、鋪裝、管線等核心區域的位置邊界,確保施工準確度。
5. Pipeline Embedding 預設管線
We will embed water supply, drainage and circuit pipelines according to the water and electricity design drawings, and take pipeline marking and protection measures to ensure the pipeline layout is compliant and free of leakage hazards.
按水電設計圖紙,預埋給排水、電路管線,做好管線標識與防護措施,保障管線布局合規、無滲漏隱患。
6. Formwork and Concrete Construction for Structures and Water Features 構筑物水景支模及混凝土施工
We will complete formwork erection and steel bar binding according to detailed structural drawings and water feature design requirements, and use compliant concrete for pouring to ensure the structures and water features are stable in structure and up to standard in shape.
按構筑詳圖與水景設計要求,完成模板搭建、鋼筋綁扎,采用合規混凝土進行澆筑,確保構筑物與水景結構穩固、形態達標。
7. Hard Paving Construction 硬質鋪裝施工
We will carry out ground hard paving operations in accordance with civil engineering design drawings, strictly controlling the splicing accuracy, flatness and joint treatment of paving materials to ensure the paving effect is consistent with the design.
依據土建設計圖,開展地面硬質鋪裝作業,嚴格把控鋪裝材料拼接精度、平整度及縫隙處理,確保鋪裝效果與設計一致。
8. Finished Paving Protection 鋪裝成品保護
Immediately after the completion of hard paving construction, we will cover the surface of finished products with professional protective materials to avoid scratches and pollution caused by subsequent construction, ensuring the integrity of the paving.
硬質鋪裝施工完成后,立即采用保護材料覆蓋成品表面,避免后續施工造成劃傷、污染,保障鋪裝完好性。
9. Woodwork and Ironwork Installation 木作與鐵藝安裝
We will process and manufacture woodwork and ironwork components according to design drawings, carry out accurate on-site installation and fixation, and conduct anti-corrosion and anti-rust treatment to ensure the components are firm, durable and meet style requirements.
按設計圖紙加工制作木作、鐵藝構件,現場準確安裝固定,做好防腐、防銹處理,確保構件牢固耐用且符合風格要求。
10. Lighting Installation 燈具安裝
We will install courtyard lighting fixtures according to the circuit layout drawing, adjust the brightness and angle of the lights to ensure the fixture positions are accurate, the circuits are safe and the lighting effect meets the standards.
依據電路布置圖,安裝庭院照明燈具,調試燈光亮度與角度,確保燈具位置正確、線路安全、照明效果達標。
11. Project Completion 工程收尾
Complete garbage removal and site cleaning in the construction area, optimize details (such as joint filling and surface wiping) , and prepare for the final acceptance inspection.
完成施工區域垃圾清運、場地清潔,對細節部位(如縫隙填補、表面擦拭)進行優化處理,為竣工驗收做好準備。